Brent$107.10(≈RM438)▲ +1.26%WTI$95.37(≈RM390)▲ +1.62%Nat Gas$3.33(≈RM14)▲ +2.78%Bunker$892.50(≈RM3,647)—Tapis$86.75(≈RM354)—JKM LNG$26.27(≈RM107)▲ +0.69%MGO$1247.50(≈RM5,097)—EU Carbon€88.05(≈RM403)▼ -0.33%TTF Gas€86.75(≈RM397)▼ -0.08%Diesel$4.97(≈RM20)▲ +2.47%Coal$150.35(≈RM614)▲ +0.97%USD/MYR4.0860—US Rigs551▲ +7 M/MRON95RM4.67(≈US$1.14)▲ +3.32% W/WRON97RM5.15(≈US$1.26)▲ +3.00% W/WDieselRM5.27(≈US$1.29)—
09:27 MYT
CommoditiesLife-SavingFirefightingManpowerPaintingDormitoryUAV TrainingConsultancy

Fire Dampers and Closures: The Half That Has to Shut

Fire main piping

A fixed firefighting system released into a space that is still being ventilated is fighting a fire that is still being fed. Dampers and closures are what make containment possible, and they are among the most consistently defective items on any ship. By MarineCraft Journal  ·  17 September 2026  ·  9 mins read … Read more

Fire Hoses, Hydrants and the Connection Nobody Can Find

Fire Hoses

Fire hoses have a maximum length as well as a minimum, nozzles must do two jobs, and every ship above 500 tons carries a brass flange that may never be used in its working life but has to be produced the moment an inspector asks for it. By MarineCraft Journal  ·  16 September … Read more

Lifebuoys: The Distribution Rule Most Ships Get Wrong

Life Buoy

A lifebuoy is a ring that floats. The complication is that SOLAS does not treat them as interchangeable: it specifies which buoys carry lights, which carry smoke, which carry lifelines, and, crucially, which combinations are not allowed on the same buoy. By MarineCraft Journal  ·  15 September 2026  ·  9 mins read Halfof … Read more

Portable Fire Extinguishers: The One, Five and Ten Year Rules

Fire Extinguisher Ball

A ship carries more portable extinguishers than any other item of safety equipment, and each one runs on three separate clocks at once. The annual service is well known. The five and ten year requirements, and the spare charge arithmetic, are where operators come unstuck. By MarineCraft Journal  ·  14 September 2026  ·  … Read more

What to Check Before You Accept a Bunker Stem

Fuel loading terminal

A fuel can meet the sulphur limit, arrive with correct paperwork, and still wreck an engine. Since the 0.50% cap reshaped the bunker pool, the operational risk moved from compliance to compatibility, and it is managed before the hose is connected rather than after. By MarineCraft Journal  ·  11 September 2026  ·  … Read more

Local Content and Workforce Sourcing on PETRONAS Projects

Worker on a vessel deck

Local content is usually described as a policy objective. On a live project it behaves as something far more concrete: a set of conditions determining which companies may bid at all, and who they are permitted to put on the job. By MarineCraft Journal  ·  10 September 2026  ·  9 mins read … Read more