
November 3, 2026 · 14 minutes ago
Adrijana Buljan
LS Cable & System and LS Marine Solution have signed a capacity reservation agreement (CRA) with Taean Wind Power for the supply and installation of subsea cables for the 504 MW Taean offshore wind farm in South Korea.
The agreement reserves manufacturing capacity at LS Cable & System’s facilities and installation slots for LS Marine Solution’s cable-laying vessels (CLVs) ahead of the main contract. The companies aim to finalize the contract, including its value and other terms, by the end of 2026.
The two companies were selected as preferred bidders for the cable package in 2024, and are now carrying out engineering work and preliminary surveys to determine cable specifications and the scope of installation.
Republished from Offshore Energy.
View the original at Offshore Energy →Source: Offshore Energy
Industry News
Get the headlines that matter
Shipping, maritime, and oil and gas news curated daily by the MarineCraft News Desk, with Malaysian and Southeast Asian developments front and centre.
We use your address only to send Industry News. Unsubscribe any time. See our Privacy Policy.
