Brent$89.46(≈RM369)▲ +0.22%WTI$80.36(≈RM331)▼ -0.17%Nat Gas$3.20(≈RM13)▲ +1.59%EU Carbon€81.26(≈RM366)—TTF Gas€91.75(≈RM414)▲ +0.57%Diesel$3.70(≈RM15)▼ -1.60%Coal$146.85(≈RM605)—USD/MYR4.1230▲ +0.26%RON95RM3.72(≈US$0.90)▼ -3.88% W/WRON97RM4.00(≈US$0.97)▼ -4.76% W/WDieselRM4.72(≈US$1.14)▼ -3.08% W/W
06:30 MYT
CommoditiesLife-SavingFirefightingManpowerPaintingDormitoryUAV TrainingConsultancy

Durban Port Congestion Becomes Headache for the Auto Industry

Congestion at Durban Gateway Terminal has moved from a port problem to an industrial one, with South Africa's automotive sector now carrying the cost.

By MarineCraft News Desk · Original report: The Maritime Executive ·

Cargo ship docking at Port of Baltimore with cranes

Congestion at Durban Gateway Terminal has moved from a port problem to an industrial one, with South Africa's automotive sector now carrying the cost.

The terminal, operated by the Philippines-based International Container Terminal Services Inc, handles close to half of South Africa's containerised cargo. Backlogs have built over recent weeks, and the South African government has attributed them to a new terminal operating system introduced by ICTSI.

The automotive supply chain has been hit hardest. Metair, the Johannesburg-listed components supplier to Toyota, Ford, Volkswagen and Isuzu plants in the country, said last week it faces delays of up to 20 days clearing inventory from the port and could invoke force majeure in its supply contracts if the position does not improve. The company put the increase in its operating costs at up to 25 per cent, driven partly by switching to airfreight for inventory that cannot wait.

The port is one pressure among several. Trade and Industry Minister Parks Tau reported last month that South African manufacturing shed 45,995 jobs over two years, and Continental has said it will close its Port Elizabeth tyre plant by early 2027, putting 950 jobs at risk and citing low-cost Asian imports alongside energy costs and supply chain disruption.

Transport Minister Barbara Creecy has threatened to revoke ICTSI's operating licence if performance does not improve within three months. ICTSI has pointed to the condition of port equipment, acknowledging service shortcomings and blaming years of under-investment and inadequate maintenance. Transnet has diverted vessels to Ngqura to discharge Durban-bound boxes, dedicated Berth 102 at Durban to geared vessels transferring those containers, and is prioritising berths for auto parts and pharmaceuticals.

The episode is worth watching from this side of the Indian Ocean for a specific reason. A terminal operating system cutover is the single highest-risk event in a container terminal's calendar, and the consequences here were measured in weeks of dwell time and a force majeure threat from a tier-one supplier. Malaysian terminals carrying transhipment volumes face the same class of risk whenever a system is replaced, and the mitigation is the same: a reversion plan that survives the first week.

This brief was written by the MarineCraft News Desk from the source’s reporting. Read the original coverage at the source.

Read the full story at The Maritime Executive →

Source: The Maritime Executive