Brent$89.46(≈RM369)▲ +0.22%WTI$80.36(≈RM331)▼ -0.17%Nat Gas$3.20(≈RM13)▲ +1.59%EU Carbon€81.26(≈RM366)—TTF Gas€91.75(≈RM414)▲ +0.57%Diesel$3.70(≈RM15)▼ -1.60%Coal$146.85(≈RM605)—USD/MYR4.1230▲ +0.26%RON95RM3.72(≈US$0.90)▼ -3.88% W/WRON97RM4.00(≈US$0.97)▼ -4.76% W/WDieselRM4.72(≈US$1.14)▼ -3.08% W/W
06:30 MYT
CommoditiesLife-SavingFirefightingManpowerPaintingDormitoryUAV TrainingConsultancy

1974-Built Rig Changes Hands as Dolphin Drilling and SPM Forge Joint Venture for Drilling Jobs in India

Dolphin Drilling has completed the sale of a 52-year-old semi-submersible and signed a joint venture to chase drilling work in India, in a shift away from owning rigs towards managing them.

By MarineCraft News Desk · Original report: Offshore Energy ·

Offshore platform with support vessel

Dolphin Drilling has completed the sale of a 52-year-old semi-submersible and signed a joint venture to chase drilling work in India, in a shift away from owning rigs towards managing them.

The Oslo-listed, Aberdeen-headquartered contractor has sold the 1974-built Blackford Dolphin to Voyage Shipping, a guaranteed nominee of the UAE-headquartered SPM Energy Shipping, for an initial $10 million cash settled at closing and a further $15 million payable on receipt of the first payment under a potential future drilling contract. The two companies have also agreed to form an India-focused joint venture to pursue offshore drilling opportunities there.

Dolphin says the disposal materially reduces its operating cost base and removes the capital expenditure tied to the rig's class renewal survey, giving it a platform to grow rig management on a capital-light basis. At the end of the second quarter the company reported total cash of $55.1 million and a firm contract backlog of $556 million, with a further $446 million in options, following multi-year contracts for Paul B. Loyd Jr. and Borgland Dolphin.

The deferred half of the consideration is the interesting term. Fifteen of the twenty-five million dollars is contingent on the rig winning work, which means the seller retains exposure to the asset's commercial prospects after handing over the keys. That is a common structure for late-life units where the buyer cannot underwrite a class survey against an empty orderbook.

For the regional market the signal is about where 1970s-built harsh-environment tonnage goes when the North Sea no longer wants it. These units migrate to basins with shallower water, gentler metocean conditions and operators willing to accept an older hull, and India, Southeast Asia and West Africa are where they land.

Malaysian yards and service contractors see that migration as reactivation and life-extension scope. A rig of this vintage entering a new market arrives needing survey work, steel renewal and systems upgrades before it can drill, and that work is tendered locally.

This brief was written by the MarineCraft News Desk from the source’s reporting. Read the original coverage at the source.

Read the full story at Offshore Energy →

Source: Offshore Energy